BP125990 - 8 - 680 Trans-Canada Highway (Chachi's)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125990 - 8 - 680 Trans-Canada Highway (Chachi's) | |
---|---|
Neighbourhood: | Newcastle/Brechin |
Street Address: | 8 - 680 Trans-Canada Highway (Chachi's) |
Type of Application: | Leasehold Improvements |
File Number: | BP125990 |
Date Application Submitted: | November 21, 2019 |
Application Description: |
(Chachi's) Tenant Improvement for take-out restaurant 26m2. Scope of work includes installation of interior partition walls and mill work. Plumbing work includes the relocation or addition of 1 HWT, 1 DW, 1 dish sink and 1 hand wash sink. Sprinkler head layout changes to existing system. Building Classification: Group A2- 3.2.2.26, one storey 805.9 sq m. Combustible construction permitted Sprinkler with fire alarm. REVISION: Delete Grease interceptor from dishwasher. July.21/2020 |
Application Status: | COMPLETED |
Permit Value: | $160,000.00 |
Builder: | BLUE ROCK CONSTRUCTION MANAGEMENT LTD |
Issued Date: | July 16, 2020 |
File Close Date: | August 28, 2020 |
Expiry Date: | July 18, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
680 TRANS-CANADA HWY | PRC1 , W1 , W2 , W3 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
PLUMBING FINAL
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL
Final Approval as per requirements on plans. |
PASSED
2020-08-28 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.