BP125962 - 78 Wharf Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125962 - 78 Wharf Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 78 Wharf Street |
Type of Application: | Leasehold Improvements |
File Number: | BP125962 |
Date Application Submitted: | November 08, 2019 |
Application Description: | (Kiaro - Cannabis retail) Leasehold Improvement for an existing 176.5m2, Group E occupancy(Retail). Work revised to removing one interior partition wall to create display area with secured product storage and staff area. Two storey building with basement (see change of use BP108574), total area = 621.75 m2, combustible, sprinklered, fire alarm. Part 3 building. 3.2.2.25. Roof assembly 45 min. FRR/FS. 2nd storey, Group C, Residential, 3 dwelling units with min. 45 min. FRR/FS 50 STM between units and the public corridor. 1st storey Group E or Group A. 2 hr FRR/FS floor assembly including 2 hr FRR for load bearing supports between 1st and 2nd storey and basement (See GHL File INA-2648.00 for Fire Resistance Ratings for basement/first floor assembly & wood columns). Basement Group E, Retail, single exit by Equivalency B. Accessibility for persons with disabilities for main floor only. REVISIONS SEP.3- Change to scope of work, No sprinkler or plumbing changes proposed. |
Application Status: | COMPLETED |
Permit Value: | $42,000.00 |
Builder: | TECHNIFIELD CONTRACTING LTD |
Issued Date: | July 17, 2020 |
File Close Date: | September 08, 2020 |
Expiry Date: | July 18, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
120 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL
All fixtures must be in place. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
SCHEDULED |
SPRINKLER FINAL
Sprinkler system must be complete and operating as intended. |
SCHEDULED |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
FINAL
Final Approval as per requirements on plans. |
PASSED
2020-09-08 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.