BP125774 - 2191 Duggan Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125774 - 2191 Duggan Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 2191 Duggan Road |
Type of Application: | Single / Two Family Alteration |
File Number: | BP125774 |
Date Application Submitted: | August 21, 2019 |
Application Description: |
Remove garage doors, convert existing garage to offices and existing storage room to washroom. 2019-DEC-09 REVISION: layout changes, convert sunroom to unconditioned space, revise lateral bracing, submit structural and geotechnical engineer reports, relocate washer/dryer, convert garage to living space, doors and windows revised. |
Application Status: | COMPLETED |
Permit Value: | $66,275.69 |
Building Area: |
17.00 M2 182.99 ft2 |
Builder: | RLS CONSTRUCTION LTD |
Issued Date: | September 24, 2019 |
File Close Date: | January 27, 2020 |
Expiry Date: | September 23, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
2191 DUGGAN ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2020-01-27 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.