Type of Application: | Leasehold Improvements |
File Number: | BP125559 |
Date Application Submitted: | May 30, 2019 |
Application Description: |
(The Master Group - HVAC Distributor) Leasehold improvement - Unit 121, 1062 m2 of F2 warehouse space. Install interior partitions, including 145m2 of subsidiary offices and meeting room. Add 2 universal washrooms, 1 staff wash basin, 1 water fountain and 1 janitors sink. 1 Hr fire separation provided to adjacent suite (vacant shell). Building Classification: 2012 BCBC, 3.2.2.75., Building area is 2234 m2, combustible or non-combustible construction permitted, building is sprinklered with fire alarm system, loadbearing walls, columns and arches supporting a rated assembly shall have a FRR not less than the supported element 45 min. Original BP123885 |
Application Status: | COMPLETED |
Permit Value: | $300,000.00 |
Builder: | WINDLEY CONTRACTING LTD |
Issued Date: | August 27, 2019 |
File Close Date: | February 05, 2020 |
Expiry Date: | August 26, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
1925 BOXWOOD ROAD | I2 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PAPER/FLASHING/WATERPROOFING | PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
OCCUPANCY-OLD |
PASSED
2020-02-05 |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.