BP125529 - 555 Brechin Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP125529 - 555 Brechin Road | |
|---|---|
| Neighbourhood: | Newcastle/Brechin | 
| Street Address: | 555 Brechin Road | 
| Type of Application: | Single / Two Family Alteration | 
| File Number: | BP125529 | 
| Date Application Submitted: | May 21, 2019 | 
| Application Description: | 
                New windows, new front porch, new entry, adding exterior insulation and new cladding. 2019-SEP-11 REVISION: reduce deck roof, change door. tjw 2020-JAN-29 REVISION: add structural engineer for beam, change interior layout.  | 
        
| Application Status: | COMPLETED | 
| Permit Value: | $75,091.47 | 
| Building Area: | 
                        85.19 M2 916.98 ft2  | 
                
| Issued Date: | July 17, 2019 | 
| File Close Date: | August 05, 2020 | 
| Expiry Date: | July 16, 2021 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 555 BRECHIN ROAD | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                EXCAVATION
                                     Excavation of soil, prior to placing forms.  | 
                            PASSED | 
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.  | 
                            PARTIAL | 
| 
                                FOOTING/FORMS
                                     Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough In plumbing must be complete including water piping.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                ROUGH IN PLUMBING
                                     Rough In plumbing must be complete including water piping.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough In plumbing must be complete including water piping.  | 
                            PASSED | 
| 
                                LATERAL BRACING & SHEATHING
                                     All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.  | 
                            FAILED | 
| 
                                LATERAL BRACING & SHEATHING
                                     All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete.  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            CANCELLED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            FAILED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            PARTIAL | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            SCHEDULED | 
| 
                                PLUMBING FINAL
                                     All fixtures must be in place.  | 
                            SCHEDULED | 
| 
                                FINAL
                                     Final approval as per requirements on plans.  | 
                            FAILED | 
| 
                                FINAL-OLD
                                     Final approval as per requirements on plans.  | 
                            
                                PASSED
                                     2020-08-05  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            