BP125416 - 115-5160 Hammond Bay Road (Phase 3) INSPECTIONS
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125416 - 115-5160 Hammond Bay Road (Phase 3) INSPECTIONS | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 115-5160 Hammond Bay Road (Phase 3) INSPECTIONS |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP125416 |
Date Application Submitted: | April 11, 2019 |
Application Description: |
FOR INSPECTIONS ONLY Building Type G Multi family strata development - Unit 115 -182.09 m2 Part 9 SFD. Two storey, sprinklered, with slab on grade construction and 20.43m2 attached garage. REVISION: Aug 4/20 - Add Geotechnical Engineer to scope of project. REVISION: Dec.24, Layout changes. REVISION: Feb.24,2021-Sprinkler changes |
Application Status: | COMPLETED |
Builder: | Canland Construction Ltd |
Issued Date: | November 12, 2019 |
File Close Date: | December 14, 2021 |
Expiry Date: | November 11, 2021 |
Process Steps
Task | Status |
---|---|
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
OCCUPANCY | FAILED |
OCCUPANCY |
PASSED
2021-12-14 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.