BP125302 - 905 Hecate Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP125302 - 905 Hecate Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 905 Hecate Street |
Type of Application: | Leasehold Improvements |
File Number: | BP125302 |
Date Application Submitted: | March 06, 2019 |
Application Description: |
Daycare occupancy on main and lower floor in previous Community Centre, (Nanaimo Innovation Academy), A-2 occupancy. Daycare for 32 children between the ages of 10 months and 5 years, and 8 staff members. Total occupant load for the building is 80 persons. Single occupancy building. Work includes 4 smoke detectors hardwired into fire alarm system; installation of handrails at interior and exterior stairs where missing, self-closer on door between floors, replacement of sink & grab bar in "universal" toilet room to be code compliant. BCBC 2012: 3.2.2.28. Group A-2, One storey (138m2) on basement, combustible construction, fire alarm. First storey < 2m above grade. 3/4 hr fire separation between basement and main floor required under 3.2.1.4. REVISION: Dec 3/19 - Changes outlined in internal notes. REVISION: Jan 6/19 - Reconfigure bathroom and relocate dishwasher and sinks. REVISION: Feb. 5/2020 - Change occupant Load. Max 80 persons.LB |
Application Status: | COMPLETED |
Permit Value: | $1,575.00 |
Issued Date: | March 29, 2019 |
File Close Date: | February 13, 2020 |
Expiry Date: | March 29, 2021 |
Associated Properties
Address | Zone | More |
---|---|---|
905 HECATE STREET | CS1 , R14 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2020-02-13 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.