BP125089 - 2289 Lynn-La-Ran Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP125089 - 2289 Lynn-La-Ran Road | |
|---|---|
| Neighbourhood: | Westwood | 
| Street Address: | 2289 Lynn-La-Ran Road | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP125089 | 
| Date Application Submitted: | December 07, 2018 | 
| Application Description: | New construction of two storey single family dwelling, on walkout basement/crawlspace, with a roughed-in secondary suite. Second dwelling on lot. DCC's applied to this permit at max 167m2 @ multifamily rate - drainage calculated on lower floor GFA. 2019-DEC-18 REVISION: Revise Structural, revise deck, foundation change to ICF, add patio door, garage window changes, revised truss layout, switch to glass guards. 2020-FEB-26 REVISION: Kitchen layouts revised, window changes, ensuite layout, shower size increase, stair direction in garage revised, bedroom 3 revised. 2021-MAY-25 REVISION: Change basement layout, change suite layout, delete rear stairs. | 
| Application Status: | COMPLETED | 
| Permit Value: | $571,336.11 | 
| Building Area: | 320.24 M2 3,447.03 ft2 | 
| Builder: | M J CHAHLEY CONSTRUCTION GROUP LTD | 
| Issued Date: | October 16, 2019 | 
| File Close Date: | May 27, 2021 | 
| Expiry Date: | October 15, 2021 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 2289 LYNN-LA-RAN ROAD | AR2 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | CANCELLED | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | FAILED | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PARTIAL | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PARTIAL | 
| FOOTING / FORMS Inspection of forms prior to any concrete being poured | PASSED | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | CANCELLED | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | PARTIAL | 
| PERIMETER DRAIN For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering | PASSED | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PARTIAL | 
| UNDERSLAB PLUMBING Complete underslab plumbing must be visible | PASSED | 
| UNDERSLAB INSULATION Inspection required prior to placing slab concrete | PASSED | 
| STORM CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| SANITARY CONNECTION Pipe and Connection must be visible for inspection | PASSED | 
| WATER CONNECTION Pipe and Connection must be visable for inspection | PARTIAL | 
| WATER CONNECTION Pipe and Connection must be visable for inspection | PASSED | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | FAILED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PARTIAL | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PARTIAL | 
| FRAMING Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection | PASSED | 
| OCCUPANCY-OLD Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | FAILED | 
| OCCUPANCY Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish | PASSED 2021-05-27 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        