BP124894 - 3816 Avonlea Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124894 - 3816 Avonlea Drive | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 3816 Avonlea Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124894 |
Date Application Submitted: | October 12, 2018 |
Application Description: |
For the construction of an addition with secondary suite at the rear of a SFD. REVISION: Mar-14/19- Crawlspace to replace slab on grade under den. Revised structural drawings show changes made. RM |
Application Status: | RETIRED |
Permit Value: | $146,088.12 |
Building Area: |
85.01 M2 915.04 ft2 |
Issued Date: | December 21, 2018 |
File Close Date: | December 22, 2020 |
Expiry Date: | December 21, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
3816 AVONLEA DRIVE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
FAILED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.