BP124843 - 106 - 5160 Hammond Bay Road (Phase 1)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP124843 - 106 - 5160 Hammond Bay Road (Phase 1)
Neighbourhood: North Slope    
Street Address: 106 - 5160 Hammond Bay Road (Phase 1)
Type of Application: Commercial / Multi / Industrial
File Number: BP124843
Date Application Submitted: September 26, 2018
Application Description: FOR INSPECTIONS ONLY

Building Type C

Multi family strata development - Unit 106 - 193.98 m2 Part 9 SFD. Two storey, sprinklered, with slab on grade construction and 21.4 m2 attached garages.

REVISION: May 2/19 - Add Geotechnical Engineer to the scope of the project. Structural changes to include increase to seismic hold downs to all buildings.
REVISION 2: July 25/19 - Mechanical room changed to Storage room, Laundry room added to Mechanical room, patio slider changed from 5o76 to 6o76, upper floor bathroom door changed and Window detail changed.
REVISION 3: Aug 4/20 - Revise scope of Geotechnical Engineer.
Application Status: COMPLETED
Issued Date: March 25, 2019
File Close Date: November 05, 2020
Expiry Date: March 24, 2021

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PASSED
WATER CONNECTION

Pipe and connection must be visible for inspection.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

FAILED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

CANCELLED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
APPROVAL-ENGINEERING

Approval required prior to Occupancy

APPROVED
OCCUPANCY-OLD CANCELLED
OCCUPANCY CANCELLED
OCCUPANCY PASSED

2020-11-05

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.