BP124802 - 155 - 4750 Rutherford Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124802 - 155 - 4750 Rutherford Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 155 - 4750 Rutherford Road |
Type of Application: | Leasehold Improvements |
File Number: | BP124802 |
Date Application Submitted: | September 12, 2018 |
Application Description: |
Tenant improvement for medical office in unit #155, (Life Labs) Group D, 232.4m2. Work includes, interior walls, dropped ceiling, mill-work, adding 5 sinks, 3 toilet rooms 1 of which is a "universal" toilet room. Landlords work to create this unit is under separate building permit. Building Classification: Group E building, BCBC 2012, 3.2.2.62, noncombustible construction sprinklered with fire alarm. REVISION: Mar 28/19 - Revised sprinkler drawings, deletion of 2 sprinkler heads. West wall changed to a 'W5' wall and existing exit stair modified to reflect landlords work permit (BP124659) and add Structural Engineer to scope of project. |
Application Status: | COMPLETED |
Permit Value: | $200,000.00 |
Issued Date: | December 17, 2018 |
File Close Date: | April 05, 2019 |
Expiry Date: | December 16, 2020 |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
FAILED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2019-04-05 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.