BP124689 - 101 - 1621 Dufferin Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124689 - 101 - 1621 Dufferin Crescent | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 101 - 1621 Dufferin Crescent |
Type of Application: | Leasehold Improvements |
File Number: | BP124689 |
Date Application Submitted: | August 03, 2018 |
Application Description: |
Tenant Improvements, #101, (Millstone Medical Centre Dental Specialists), "D" occupancy, 196.3m2. Work includes installation of interior walls, closing off one set of exterior doors, 6 dental chair units, 5 sinks, 1 Dish Washer, 1 "universal" washroom, 1 unisex with shower, sprinkler changes, dropped ceiling. Fire separation between suite and lobby with no fire resistance rating. Building designed to 2012 BCBC 3.2.2.65 Group E, 3.2.2.24, Group A2 and 3.2.2.59 Group D superimposed major occupancies. 3 storey, non-combustible construction, sprinklers and fire alarm. 1 hour rated floor assembly required above the first storey including supporting construction. O Hour required above the second storey and roof. 1.5 hrs to parking garage. 2763 m2 total on 3 floors, with 1353m2 parking garage (BCBC building area =2274 m2) REVISION: Dec 19/18 - Add 2 sinks, add Washer/Dryer in staff room, enlarge CT scan room by 1'-0" and change solid wall to accordion wall style. |
Application Status: | COMPLETED |
Permit Value: | $185,000.00 |
Builder: | RW (BOB) WALL LTD |
Issued Date: | November 28, 2018 |
File Close Date: | February 15, 2019 |
Expiry Date: | November 27, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
101 1621 DUFFERIN CRESCENT | CC5 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2019-02-15 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.