BP124674 - 740 Haliburton Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124674 - 740 Haliburton Street | |
---|---|
Neighbourhood: | South End |
Street Address: | 740 Haliburton Street |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124674 |
Date Application Submitted: | July 30, 2018 |
Application Description: |
Update upstairs/ renovate entire building / construct a legal secondary suite. 2019-AUG-27 REVISION: revise p eng, move washer/dry in suite, add washer/dryer to upper floor, add windows in gable ends. tjw ***REJECTED; NEW ARCH DRAWINGS REQUIRED TO MATCH STRUCTURAL. 2019-DEC-06 REVISION: Relocate washer/dryer, add washer dryer and sinks upstairs, revise windows to upper floor. (Revision postponed) |
Application Status: | RETIRED |
Permit Value: | $195,129.83 |
Builder: | ER HOMES LTD |
Issued Date: | October 02, 2018 |
File Close Date: | July 15, 2021 |
Expiry Date: | October 02, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
740 HALIBURTON STREET | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
CANCELLED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
FAILED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PARTIAL |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
CANCELLED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
MONITORED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.