BP124629 - A - 321 Selby Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124629 - A - 321 Selby Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | A - 321 Selby Street |
Type of Application: | Leasehold Improvements |
File Number: | BP124629 |
Date Application Submitted: | July 12, 2018 |
Application Description: |
Tenant Improvement for coffee shop, Unit A, (White Rabbit Cafe), Group A - 2 occupancy, 74.6m2. Work includes 1 new "universal" washroom, 1 unisex washroom, mop sink, dishwasher, 3 sinks + water to equipment and mill-work. Ceiling/floor above is being installed with 1 hr. fire resistance rating to complete separation of tenant spaces. Existing one hour fire separation between basement and at wall between suites. Basement below this tenant space is ancillary to adjoining pub tenant. Occupant load 20 persons. NOV 30, 2018 - REVISION: Revise sprinkler heads locations. Building Classification BCBC 2012: Group A, Division 2 , 3.2.2.26. sprinklered with fire alarm system, Building area 335m2 - 2 storey + basement. Basement is ancillary to the other A2 suite. 1 hr. FRR/FS for suite separation most restrictive, no roof rating. 2010 Alternative Solution by GHL. |
Application Status: | COMPLETED |
Permit Value: | $30,000.00 |
Builder: | TECTONICA MANAGEMENT INC |
Issued Date: | October 16, 2018 |
File Close Date: | January 18, 2019 |
Expiry Date: | October 15, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
321 SELBY STREET | DT2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
CANCELLED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
CANCELLED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2019-01-18 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.