BP124389 - 2687 Jingle Pot Rd
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124389 - 2687 Jingle Pot Rd | |
---|---|
Neighbourhood: | Westwood |
Street Address: | 2687 Jingle Pot Rd |
Type of Application: | Locate Permit |
File Number: | BP124389 |
Date Application Submitted: | May 01, 2018 |
Application Description: | Foundation for A277 modular home locate |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Building Area: |
130.43 M2 1,403.94 ft2 |
Builder: | GORDONS HOMES SALES LTD |
Issued Date: | June 14, 2018 |
File Close Date: | July 30, 2019 |
Expiry Date: | June 14, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
2687 JINGLE POT ROAD | AR2 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PASSED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.