BP124358 - 3311 STEPHENSON POINT ROAD
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124358 - 3311 STEPHENSON POINT ROAD | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3311 STEPHENSON POINT ROAD |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124358 |
Date Application Submitted: | April 24, 2018 |
Application Description: |
For the construction of a rear covered deck and addition of a laundry room with roof top deck, add windows, doors and stairs. June 6/18: revision - change from isolated pad footings to foundation wall, changes to BWP's locations/lengths REVISION: up size beam to 3-2x12 move posts 03.07.2018 REVISION: Add exterior stairs and dog wash 13.08.2018 |
Application Status: | COMPLETED |
Permit Value: | $120,000.00 |
Building Area: |
13.38 M2 144.02 ft2 |
Builder: | PHEASANT HILL HOMES LTD |
Issued Date: | May 17, 2018 |
File Close Date: | November 26, 2018 |
Expiry Date: | May 17, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
3311 STEPHENSON POINT ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2018-11-26 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.