BP124348 - 7 - 4890 Rutherford Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124348 - 7 - 4890 Rutherford Road | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 7 - 4890 Rutherford Road |
Type of Application: | Leasehold Improvements |
File Number: | BP124348 |
Date Application Submitted: | April 20, 2018 |
Application Description: |
Tenant Improvement in CRU #7, (Papa John's), Group E Take-out pizza, 135.5m2. Work includes interior mill-work, full commercial kitchen with 5 sinks, ovens, cooler, existing underslab plumbing in place for "universal" toilet room. Revision to Mechanical drawings Oct 10, 2018 remove 3 floor drains + identify washroom as existing. New steel stud wall with 5/8" type X drywall added to existing non-conforming Firewall dividing buildings (now forms part of the Firewall) and one hour fire separation for demising wall and rated ceiling to separate unit #7 from unit #9 constructed under BP123844. BCBC 2012 Group A2, 3.2.2.28. one storey, 1200m2 facing 3 streets (doubled size permitted provided no basement) and min. 1 hr FS between suites, combustible construction, Major occupancies in building are E and A-2, 2 storey, unsprinklered, fire alarm, floor /roof assemblies 45 min FRR/FS. Actual building size 761.62 m2, ends at firewall. |
Application Status: | COMPLETED |
Permit Value: | $125,000.00 |
Issued Date: | August 22, 2018 |
File Close Date: | December 12, 2018 |
Expiry Date: | August 21, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
4890 RUTHERFORD ROAD | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
APPROVAL-FIRE-OLD
Approval required prior to Occupancy |
COMPLETED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-12-12 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.