BP124324 - 3589 Shenton Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124324 - 3589 Shenton Road | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 3589 Shenton Road |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP124324 |
Date Application Submitted: | April 12, 2018 |
Application Description: |
Renovation to interior and exterior of existing building for (Sign Zone) a Group F-2 occupancy, 390.39m2 main floor and 135m2 lower floor. Change of use from A-2 to F-2. Work includes new exterior facade, partial reconstruction of the 3/4 hr FRR/FS exit stairs on both floors, new windows and doors, new walls for office, lunch room, new insulation and drywall, electrical and new plumbing for dish washer, sinks, utility sink and relocation of sink in "universal" washroom. Two hour Fire Resistance Rating for spatial construction requirements of right and left side exterior walls. Occupant load 20 persons based on washrooms available. Building Classification: 390.39m2 Part 9 building, Group F-2 combustible and non-combustible construction, un-sprinklered, 45 min FRR for floor and supports are existing. |
Application Status: | COMPLETED |
Permit Value: | $284,280.00 |
Builder: | Meca Holdings Inc |
Issued Date: | August 27, 2018 |
File Close Date: | January 08, 2019 |
Expiry Date: | August 27, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
3589 SHENTON ROAD | I2 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-01-08 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.