BP124311 - 302 - 60 Commercial Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124311 - 302 - 60 Commercial Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 302 - 60 Commercial Street |
Type of Application: | Leasehold Improvements |
File Number: | BP124311 |
Date Application Submitted: | April 06, 2018 |
Application Description: |
T I for unit #302 (Archer and Arrow Boutique) Group E occupancy, 174.75m2. Work includes interior walls, 3 change rooms (one being "accessible"), "accessible" toilet room with 8' ceiling, 8 new sprinkler heads from previous permit, Demising walls remain untouched; interior walls are 8' with the exception of the storage room. Services for plumbing and HVAC through slab done under permit BP115223; fire stopping system for piping transition by GHL. REVISION: additional sprinkler heads. Vancouver Island Conference Centre 3 storeys with basement - the basement (Group F3), retail space (Group E) & Museum/Conference entry. The 2nd storey contains museum, meeting space, retail (E) & conference support spaces (Group A2). The third storey contains the main conference areas & auditorium (Group A2). Non-combustible construction, sprinklered with fire alarm BCBC1998 3.2.2.57, Group E most restrictive & 3.2.2.24 Group A & 3.2.2.75 Group F3 Bldg area (for code) 5820m2 footprint. |
Application Status: | COMPLETED |
Permit Value: | $50,000.00 |
Builder: | HAMMERBEAM CONSTRUCTION LTD. |
Issued Date: | July 30, 2018 |
File Close Date: | October 19, 2018 |
Expiry Date: | July 29, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
60 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-10-19 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.