BP124309 - 101 - 4535 Uplands Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124309 - 101 - 4535 Uplands Drive | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 101 - 4535 Uplands Drive |
Type of Application: | Leasehold Improvements |
File Number: | BP124309 |
Date Application Submitted: | April 06, 2018 |
Application Description: |
Leasehold improvements for unit 101, (Speak Easy Communication & Education), Group D, 143.6m2. Work includes installing "accessible" washroom, staff room sink, sprinkler changes, creating interior offices, lunch room and reception. Location of sprinklers in this suite is restricted by GHL Alternative Solution from base building permit. Existing FS/FRR at floor exceeds required 1 hr separation between Group C and Group D occupancies. Demising walls between suites created under base building permit. Maximum occupant load 10 persons, 3.7.2.2(4) BCBC Building Classification: Part 9, 2 storey strata, main floor Group E, mercantile and Group D, office occupancies, 560m2 with 4 CRU's, second floor Group C occupancy 465.63m2, 8 residential units. Building sprinklered, fire alarm system. 2hr horizontal FS/FRR installed under base building permit between residential and commercial units. Alternative solution for protection of openings for the east and west walls of the first storey. |
Application Status: | COMPLETED |
Permit Value: | $80,000.00 |
Issued Date: | July 26, 2018 |
File Close Date: | October 02, 2018 |
Expiry Date: | July 27, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
4535 UPLANDS DRIVE | COR3 | Property Report |
101 4535 UPLANDS DRIVE | COR3 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
FAILED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-10-02 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.