BP124211 - 3514 Fairview Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124211 - 3514 Fairview Drive | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 3514 Fairview Drive |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124211 |
Date Application Submitted: | March 09, 2018 |
Application Description: |
Renovate basement to create secondary suite and convert garage to living space. REVISION: remove wall add beam in kitchen 09.05.2018 REVISION: Relocated Mechanical room and 3pc bathroom. Relocated suite laundry. Removed wall adjacent bottom flight of stairs, replace with dropped beam. Alter wall location and relocate BR#3 door. Add 3 windows to Family room....MLB |
Application Status: | COMPLETED |
Permit Value: | $40,000.00 |
Building Area: |
40.88 M2 440.03 ft2 |
Issued Date: | May 08, 2018 |
File Close Date: | July 10, 2020 |
Expiry Date: | May 08, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
3514 FAIRVIEW DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
CANCELLED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2020-07-10 |
FINAL
Final approval as per requirements on plans. |
FAILED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.