BP124129 - 164 Prince John Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124129 - 164 Prince John Way | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 164 Prince John Way |
Type of Application: | Single / Two Family Alteration |
File Number: | BP124129 |
Date Application Submitted: | February 15, 2018 |
Application Description: |
Add 2 new bathroom groups and laundry on lower floor of dwelling. Basement finished without permit. REVISION: change entire basement layout add secondary suite July 6, 2018 2020-JUL-15 REVISION: Slider changed to swing door, exterior door deleted, interior wall/bedroom deleted, showers changed to tubs, hwt added, partition/door changes, existing fireplace added to plans. 2021-JAN-20 REVISION: delete closet, add door, change door swings |
Application Status: | COMPLETED |
Permit Value: | $20,000.00 |
Builder: | BOEHM CONSTRUCTION LTD |
Issued Date: | April 12, 2018 |
File Close Date: | January 26, 2021 |
Expiry Date: | April 12, 2022 |
Associated Properties
Address | Zone | More |
---|---|---|
164 PRINCE JOHN WAY | R5 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL
Final approval as per requirements on plans. |
PASSED
2021-01-26 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.