BP124017 - 306 - 60 Commercial Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP124017 - 306 - 60 Commercial Street | |
---|---|
Neighbourhood: | Downtown/Old City |
Street Address: | 306 - 60 Commercial Street |
Type of Application: | Leasehold Improvements |
File Number: | BP124017 |
Date Application Submitted: | January 11, 2018 |
Application Description: |
Tenant Improvement (Gelato shop), Change of use for CRU from Group E to Group D (Low occupant Group A2), Unit 306 is 167.2 m2, install interior partition walls, retail counter and small seating area. Plumbing additions are: install 1 three compartment sink,1 commercial dishwasher, 1 mop sink and 3 hand wash sinks. Maximum occupant load of 10 persons based on 1 existing accessible washroom. Vancouver Island Conference Centre - 3 storeys with basement - the basement & 1st storey contain parking (Group F3),retail space (Group E) & Museum/Conference entry.The 2nd storey contains museum,meeting space, retail (E) & conference support spaces (Group A2).The third storey contains the main conference areas & auditorium (Group A2). Non-combustible construction, sprinklered with fire alarm 3.2.2.57, Group E most restrictive & 3.2.2.24 Group A & 3.2.2.75 Group F3 Bldg area (for code) 5820m2 footprint. |
Application Status: | COMPLETED |
Permit Value: | $100,000.00 |
Issued Date: | March 28, 2018 |
File Close Date: | May 25, 2018 |
Expiry Date: | March 27, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
60 COMMERCIAL STREET | DT1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-05-25 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.