BP123891 - 4319 Boban Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123891 - 4319 Boban Drive | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 4319 Boban Drive |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP123891 |
Date Application Submitted: | November 30, 2017 |
Application Description: |
(Supertech Diesel) Building Classification 3.2.2.77, F2, 2 storey, 781.0 m2, sprinklered, 45min FRR for mezzanine and loadbearing columns and walls. Converting the Mezzanine to create a second storey. New second storey consists of 2 offices, lunchroom, 3 pcs. bathroom and laundry facility. Second floor and exit stairs have F/S with 45 min. F.R.R. One man door being relocated and new overhead door added at rear elevation of the building. Rear, Left and Right exterior walls require a 2 hr. F.R.R, F/S with 1.5 hr FRR required for doors as closures . Two overhead doors being removed, one man door added and two windows added on front of building. REVISION: May 17/18 - Delete closet in upper floor office. |
Application Status: | COMPLETED |
Permit Value: | $50,000.00 |
Building Area: |
86.30 M2 928.92 ft2 |
Builder: | SUPERTECH VEHICLE INSPECTIONS INC |
Issued Date: | March 12, 2018 |
File Close Date: | March 11, 2019 |
Expiry Date: | March 12, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
4321 BOBAN DRIVE | I2 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-03-11 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.