BP123884 - 4996 & 4992 Currie Place (Building 5)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP123884 - 4996 & 4992 Currie Place (Building 5) | |
|---|---|
| Neighbourhood: | North Slope | 
| Street Address: | 4996 & 4992 Currie Place (Building 5) | 
| Type of Application: | Commercial / Multi / Industrial | 
| File Number: | BP123884 | 
| Date Application Submitted: | November 27, 2017 | 
| Application Description: | Construction of a duplex consisting of 2 at grade single storey patio homes on crawlspace | 
| Application Status: | COMPLETED | 
| Permit Value: | $520,000.00 | 
| Builder: | RLS CONSTRUCTION LTD | 
| Issued Date: | February 15, 2018 | 
| File Close Date: | August 28, 2018 | 
| Expiry Date: | February 15, 2020 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 4996 CURRIE PLACE | R6 | Property Report | 
| 4992 CURRIE PLACE | R6 | Property Report | 
| 4951 DENFORD PLACE | R6 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PARTIAL | 
| FOOTING/FORMS Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. | PASSED | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PARTIAL | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PARTIAL | 
| PERIMETER DRAIN For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. | PASSED | 
| STORM CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| SANITARY CONNECTION Pipe and connection must be visible for inspection. | PASSED | 
| WATER CONNECTION Pipe and connection must be visible for inspection. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PARTIAL | 
| ROUGH IN PLUMBING Rough in plumbing must be complete including potable water piping. | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| LATERAL BRACING & SHEATHING All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. | PASSED | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PARTIAL | 
| PAPER/FLASHING/WATERPROOFING When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. | PASSED | 
| ROUGH IN SPRINKLER Rough in sprinkler must be complete and visable for inspection. | PASSED | 
| FRAMING Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. | PASSED | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PARTIAL | 
| INSULATION Insulation and vapour barrier to be complete prior to inspection. | PASSED | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | FAILED | 
| INTERIOR BRACED WALL PANELS The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. | PASSED | 
| SPRINKLER FINAL-OLD Sprinkler system must be complete and operating as intended. | PASSED | 
| PLUMBING FINAL-OLD All fixtures must be in place. | PARTIAL | 
| PLUMBING FINAL-OLD All fixtures must be in place. | PASSED | 
| OCCUPANCY-OLD | PASSED 2018-08-28 | 
| Map | 
|---|
|  View in Google Earth (KML) | 
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

