BP123777 - 106 - 6461 Metral Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123777 - 106 - 6461 Metral Drive | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 106 - 6461 Metral Drive |
Type of Application: | Leasehold Improvements |
File Number: | BP123777 |
Date Application Submitted: | October 18, 2017 |
Application Description: |
Tenant improvement to unit #106 (Once Upon A Child) Group E Occupancy. Unit area 302.12 m2, one accessible washroom, 2hr F/S FRR wall provided between Unit #105 and between Unit #107, 2hr FS/FRR wall also provided for storage room walls. Building Classification: Building Area = 3260 m2, 2012 BCBC, Group E occupancy, 3.2.2.62,single storey, any height, any area,non combustible construction, sprinklered with fire alarm system building. Floor assemblies, loadbearing walls and columns require 2hr FRR. Mezzanines require 1hr FRR. |
Application Status: | COMPLETED |
Permit Value: | $200,000.00 |
Builder: | ALAIR HOMES NANAIMO |
Issued Date: | December 05, 2017 |
File Close Date: | January 30, 2018 |
Expiry Date: | December 05, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
6461 METRAL DRIVE | CC4 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-01-30 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.