BP123684 - 91 Chapel Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP123684 - 91 Chapel Street
Neighbourhood: Downtown/Old City    
Street Address: 91 Chapel Street
Type of Application: Commercial / Multi / Industrial
File Number: BP123684
Date Application Submitted: September 18, 2017
Application Description: Construction of a 61 unit multi-family development with 5 live/work units. Classified as 3.2.2.50 Group C, up to 6 storey, sprinklered, fire alarm system over an F3 Storage garage separated from residential use by a 1.5hr FS/FRR. Floors have a 1 hr FS/FRR, separation between residential units 1hr FS/FRR, Elevator shaft 1.5hr FS/FRR, exit stairs 1.5hr FS/FRR. Storage and Garbage rooms 1hr FS/FRR. Alternative Solution by GHL which addresses exit exposure protection for exterior passageway by using sprinklered water curtain.

REVISION: July 4/19 - Revise bike storage room walls from W3 to W5.
REVISION 2: July 18/19 - Revise deck sprinklers.
REVISION 3: Sept 24/19 - Move door location in live work units on Chapel side, change wall in live work to W6. Revise courtyards, planters and stairs at both Skinner and Chapel Street.
REVISION 4: Jan 20/20 - As-built stair details on pg. A602
REVISION 5: Feb 13/20 - Add cladding to block wall.
Application Status: COMPLETED
Permit Value: $8,647,959.00
Builder: ISLAND WEST COAST DEVELOPMENTS
Issued Date: May 31, 2018
File Close Date: July 21, 2020
Expiry Date: May 31, 2020

Process Steps

Task Status
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
STORM CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
SANITARY CONNECTION

Pipe and connection must be visible for inspection.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.