BP123648 - 431 Seventh Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP123648 - 431 Seventh Street | |
|---|---|
| Neighbourhood: | Harewood | 
| Street Address: | 431 Seventh Street | 
| Type of Application: | Accessory Building | 
| File Number: | BP123648 | 
| Date Application Submitted: | August 31, 2017 | 
| Application Description: | 
                For the construction of a two storey carriage house, maximum Gross Floor Area permitted is 132 m2 since a garage or carport does not exist within the principle building. Dec 14/17: Revision - adding shower to lower floor, constructing utility room for HW tank Jan 29/18: Revision - change stair run direction  | 
        
| Application Status: | COMPLETED | 
| Permit Value: | $142,957.66 | 
| Building Area: | 
                        65.73 M2 707.51 ft2  | 
                
| Builder: | SEE THE FUTURE CONTRACTING | 
| Issued Date: | October 05, 2017 | 
| File Close Date: | July 16, 2018 | 
| Expiry Date: | October 07, 2019 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 431 SEVENTH STREET | R5 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                EXCAVATION
                                     Excavation of soil, prior to placing forms.  | 
                            PASSED | 
| 
                                FOOTING/FORMS
                                     Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite.  | 
                            PASSED | 
| 
                                FOOTING/FORMS
                                     Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite.  | 
                            CANCELLED | 
| 
                                FOOTING/FORMS
                                     Inspection of Forms prior to any concrete being poured for footing inspection. Forms must be complete and approved plans (complete with City Stamp) must be onsite.  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.  | 
                            PASSED | 
| 
                                WATER CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PARTIAL | 
| 
                                WATER CONNECTION
                                     Pipe and connection must be visible for inspection.  | 
                            PASSED | 
| 
                                SANITARY CONNECTION
                                     Pipe and Connection must be visible for inspection.  | 
                            PARTIAL | 
| 
                                SANITARY CONNECTION
                                     Pipe and Connection must be visible for inspection.  | 
                            PASSED | 
| 
                                STORM CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PARTIAL | 
| 
                                STORM CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PASSED | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible.  | 
                            PARTIAL | 
| 
                                UNDERSLAB PLUMBING
                                     Complete underslab plumbing must be visible.  | 
                            PASSED | 
| 
                                UNDERSLAB INSULATION
                                     Inspection required prior to placing slab concrete.  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping.  | 
                            CANCELLED | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping.  | 
                            PASSED | 
| 
                                LATERAL BRACING & SHEATHING
                                     All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.  | 
                            PARTIAL | 
| 
                                LATERAL BRACING & SHEATHING
                                     All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors.  | 
                            PASSED | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            CANCELLED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            FAILED | 
| 
                                FRAMING
                                     Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection.  | 
                            PASSED | 
| INTERIOR BRACED WALL PANELS | PASSED | 
| 
                                OCCUPANCY-OLD
                                     Occupancy inspection to be used for new accessory suite (Carriage House). Covenant must be registered on title, HPO in place, private outdoor space must be provided for occupants, one onsite parking spot  | 
                            FAILED | 
| 
                                OCCUPANCY-OLD
                                     Occupancy inspection to be used for new accessory suite (Carriage House). Covenant must be registered on title, HPO in place, private outdoor space must be provided for occupants, one onsite parking spot  | 
                            FAILED | 
| 
                                OCCUPANCY-OLD
                                     Occupancy inspection to be used for new accessory suite (Carriage House). Covenant must be registered on title, HPO in place, private outdoor space must be provided for occupants, one onsite parking spot  | 
                            
                                PASSED
                                     2018-07-16  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            
            The Information Provided within this website is for Informational Purposes Only.
            It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.
            
        

 View in Google Earth (KML)