BP123470 - 4119 & 4121 Emerald Wood Place (Phase 11)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123470 - 4119 & 4121 Emerald Wood Place (Phase 11) | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 4119 & 4121 Emerald Wood Place (Phase 11) |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP123470 |
Date Application Submitted: | July 05, 2017 |
Application Description: |
PH 11 - MULTI- FAMILY DEVELOPMENT DESCRIPTION 4066 Old Slope Place - 70 units in 35 one and two storey duplex buildings. SL 21 & 22, Bldg type F DUPLEX - Two storey, slab on grade, with 1 hour FS/FRR between each unit, sprinklered, Alternative Solution for Water Supply for Firefighting requires No Permitted openings on the side elevations of the affected units. REVISION: Aug 24/18 - Lower floor layout changed (new sprinkler drawings) and man door changed in garage (new structural drawings). New bar sink added and window relocated from stairwell to den at rear. REVISION 2: Oct 24/18 - Add 2 closets on the upper floor and add F/P |
Application Status: | COMPLETED |
Permit Value: | $500,000.00 |
Builder: | 1083039 BC LTD |
Issued Date: | May 23, 2018 |
File Close Date: | January 31, 2019 |
Expiry Date: | May 23, 2020 |
Associated Properties
Address | Zone | More |
---|---|---|
4119 EMERALD WOODS PLACE | R6 | Property Report |
4121 EMERALD WOODS PLACE | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
CANCELLED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2019-01-31 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.