BP123433 - 5764 / 5766 Linley Valley Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123433 - 5764 / 5766 Linley Valley Drive | |
---|---|
Neighbourhood: | Linley Valley |
Street Address: | 5764 / 5766 Linley Valley Drive |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP123433 |
Date Application Submitted: | June 30, 2017 |
Application Description: |
Two storey attached duplex with slab on grade. REVISION: 2017-Aug-31 - Redesign the front walls of the garage . The walls are no longer offset. The maximum roof elevation has been reduced to 179.29 m. BAL REVISION: 2017-Oct-25 - Add a window at the kitchen sink, (unit 5764). BAL REVISION: 2017-Dec-22 - Change the stairway layout at the upper floor. BAL |
Application Status: | COMPLETED |
Building Area: |
353.50 M2 3,805.04 ft2 |
Builder: | COASTAL SQUARE HOMES INC |
Builder: | COASTAL SQUARE HOMES INC |
Issued Date: | August 16, 2017 |
File Close Date: | May 25, 2018 |
Expiry Date: | August 16, 2019 |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2018-05-25 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.