BP123388 - 124 Tait Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123388 - 124 Tait Road | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 124 Tait Road |
Type of Application: | Garage / Carport Permit |
File Number: | BP123388 |
Date Application Submitted: | June 15, 2017 |
Application Description: |
105.9 m2 unheated accessory building Jan 7/19: Revision - partition wall changed to 6' in length REVISION: 2017-Sept-19 - Add 3 pc W/C and change to 4' overhang at the front of the building. BAL REVISION: add roughin for laundry sink add bathroom window 14.11.2018 |
Application Status: | COMPLETED |
Permit Value: | $43,918.50 |
Building Area: |
105.90 M2 1,139.90 ft2 |
Issued Date: | July 28, 2017 |
File Close Date: | March 19, 2020 |
Expiry Date: | July 29, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
124 TAIT ROAD | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
MONITORING FIELD REVIEW | PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PASSED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PARTIAL |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
CANCELLED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
CANCELLED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2020-03-19 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.