BP123269 - 345 Haliburton Street
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123269 - 345 Haliburton Street | |
---|---|
Neighbourhood: | South End |
Street Address: | 345 Haliburton Street |
Type of Application: | Garage / Carport Permit |
File Number: | BP123269 |
Date Application Submitted: | May 12, 2017 |
Application Description: |
(Surya Woodworking) New construction of 25.54 m2 Group F3 Workshop with existing 116.5 m2 Group E occupancy. Existing Group C residential is 116.2 m2 of building. 4 pcs. bathroom in commercial area staff room was always a 3 pcs. To remain a 3 pcs bathroom. REVISION: Aug 15/17 - Relocate 6 x 6 posts and pad footings in garage. Max. span to be 10' 4"" between posts. REVISION: Oct 23/17 - Relocate B.W.P and man door at front corner of garage, add man door to rear of garage and beam spans updated. |
Application Status: | COMPLETED |
Permit Value: | $31,318.43 |
Building Area: |
25.54 M2 274.91 ft2 |
Issued Date: | July 28, 2017 |
File Close Date: | May 25, 2018 |
Expiry Date: | July 29, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
345 HALIBURTON STREET | I1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
MONITORING FIELD REVIEW | COMPLETED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
FAILED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PARTIAL |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
FAILED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2018-05-25 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.