BP123256 - 3736 Belaire Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123256 - 3736 Belaire Drive | |
---|---|
Neighbourhood: | Hammond Bay |
Street Address: | 3736 Belaire Drive |
Type of Application: | Single / Two Family Dwelling |
File Number: | BP123256 |
Date Application Submitted: | May 08, 2017 |
Application Description: |
For the construction of a 3 storey SFD containing a SS, slab on grade and attached 2 car garage. 2019-OCT-05 REV: change geotech. tjw 2019-SEP-25 REV: Add P Eng for frameless glass guard. tjw 2019-FEB-01 REV; multiple changes to door locations, kitchen layouts laundry layout. tjw Dec 21/18: Rev- change layout powder room / move bar sinks Dec 4/18: Revision - change to Structural drawing; adding beam to great room and add windows beside mstr bed slider Nov 29/17: Revision - change secondary suite to 2 bedroom, increase building size, increase deck size, move interior partition walls, add plumbing fixtures REVISION 1: Feb 28, 2018 - change from flat roof to 4:12 pitch roof, Includes Structural Sheet change for PAD FOOTINGS REVISION 2: May 14/18 - Relocate Washer/Dryer in suite and footings at rear. REVISION 3: 2018-AUG-14 Change engineered pad footing size. Nov 20/18: Revision - change slider in breakfast nook to 8'0 x 6'0, add washroom group to bedroom #2 |
Application Status: | COMPLETED |
Permit Value: | $666,710.62 |
Building Area: |
472.23 M2 5,083.04 ft2 |
Builder: | 0978993 BC LTD |
Issued Date: | August 15, 2017 |
File Close Date: | October 07, 2019 |
Expiry Date: | August 15, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
3736 BELAIRE DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PARTIAL |
FOOTING / FORMS
Inspection of forms prior to any concrete being poured |
PASSED |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PARTIAL |
PERIMETER DRAIN
For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PARTIAL |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
CANCELLED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
SANITARY CONNECTION
Pipe and Connection must be visible for inspection |
PASSED |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PARTIAL |
WATER CONNECTION
Pipe and Connection must be visable for inspection |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
FAILED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
FAILED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
FAILED |
OCCUPANCY-OLD
Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish |
PASSED
2019-10-07 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.