BP123224 - 432 Howard Avenue
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123224 - 432 Howard Avenue | |
---|---|
Neighbourhood: | University District |
Street Address: | 432 Howard Avenue |
Type of Application: | Locate Permit |
File Number: | BP123224 |
Date Application Submitted: | May 03, 2017 |
Application Description: |
To complete BP120207 for relocated dwelling Revision: June 10, 2015 -- Extend deck to front of dwelling, add 6' x 8' deck at side of dwelling, relocate man door to under deck, delete stairs and covered structure from lower floor to upper floor, delete bathroom and office space from garage level and open up wall with beams to connect both garage portions. REVISION JUNE 30, 2015 - 4' Wall added, beam size changed to 3 Ply 2x8, footing required beneath wall. |
Application Status: | RETIRED |
Permit Value: | $15,000.00 |
Building Area: |
170.38 M2 1,833.95 ft2 |
Issued Date: | May 15, 2017 |
File Close Date: | September 10, 2018 |
Expiry Date: | May 15, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
432 HOWARD AVENUE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
LATERAL BRACING & SHEATHING
All nailing and blocking associated with braced wall panels to be completed for this inspection. Wood-based interior braced wall panels to be sheathed. Exterior braced wall panel locations to be clearly marked out on the interior and exterior. Interior braced wall panels to be clearly marked so their location can be seen now and later at the time of INTERIOR BRACED WALL PANEL INSPECTION. Additional anchor bolts shall be installed two per braced wall panel where a building contains framed walls supporting more than two floors. |
CANCELLED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
INTERIOR BRACED WALL PANELS
The location of interior braced wall panels to be clearly indicated. This inspection is to take place prior to the installation of tape and joint compound. |
CANCELLED |
MONITORING FIELD REVIEW | FAILED |
MONITORING FIELD REVIEW | FAILED |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.