BP123020 - 160 Tait Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP123020 - 160 Tait Road | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 160 Tait Road |
Type of Application: | Garage / Carport Permit |
File Number: | BP123020 |
Date Application Submitted: | March 10, 2017 |
Application Description: |
Construction of 30' x 32' detached garage REVISION 2017-JUL-06: Increase overall height, add Structural Engineer, add full bathroom. Jul 17/17: Revision - add washer/dryer, change tub to shower, move HW tank Oct 27/17: Revision - add windows, framed portion of wall height modified |
Application Status: | COMPLETED |
Permit Value: | $37,866.24 |
Building Area: |
89.10 M2 959.06 ft2 |
Issued Date: | March 29, 2017 |
File Close Date: | August 01, 2018 |
Expiry Date: | March 29, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
160 TAIT ROAD | R1 | Property Report |
Process Steps
Task | Status |
---|---|
EXCAVATION
Excavation of soil, prior to placing forms. |
PASSED |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
FAILED |
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete |
PASSED |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
STORM CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PARTIAL |
SANITARY CONNECTION
Pipe and connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
CANCELLED |
ROUGH IN PLUMBING
Pipe and connection must be visable for inspection. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
FAILED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2018-08-01 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.