Application Description: |
Tenant improvement to CRU (unit #103) - 141.48m2, Group D occupancy, Install interior partion walls, relocate 11 sprinkler heads, 1 universal washroom, existing 1 hr FRR demissing wall between units 102 & 103, 45 min required. Building Classification - Part 9, Building area = 483.6m2, 3-storey, sprinklered/fire alarm, combustible construction, non combustible plumbing, 1st floor, Group E/D = 483.6 m2., 2nd storey, Group C = 455m2, 3rd Storey, Group C = 287m2. The dwelling units are served by a non-combustible exterior exit passageway (on the 2nd storey with exits at each end with a 45min FRR minimum because of deck occupancy provided for the deck/exterior passageway . 2 hr FRR/FS 50 STM between the 1st and 2nd storey E to C. REVISION: May 10/17 - Add wall to mechanical room. |
Application Status: | COMPLETED |
Permit Value: | $6,000.00 |
Builder: | P S M MANAGEMENT LTD |
Issued Date: | March 09, 2017 |
File Close Date: | May 12, 2017 |
Expiry Date: | March 11, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
103 5170 DUNSTER ROAD | CC1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2017-05-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.