Application Description: |
Rebuild interior partion walls, structural framing repair and re plumb washrooms. Group A2 occupancy , Multi purpose centre, 439.5 m2 main floor, building area (code ), lower floor 180 m2 . Removal of 3 interior walls on the main floor and installing 3 new beams, finished with drywall. Renovating 2 bathrooms. 35 parking spaces to be provided as per the zoning bylaw. Maximum occupant load = 100 . Existing Group A2 , unsprinklered with fire alarm , was Five Acres Alternative School REVISION: Mar 29/17 - Add wall to create office, remove wall to create conforming H/C accessible washroom, replace int. window with door. |
Application Status: | COMPLETED |
Permit Value: | $35,000.00 |
Issued Date: | March 24, 2017 |
File Close Date: | May 23, 2017 |
Expiry Date: | March 24, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
897 HARBOUR VIEW STREET | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-05-23 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.