BP122778 - 1,2,3 - 2535 McCullough Road
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP122778 - 1,2,3 - 2535 McCullough Road | |
---|---|
Neighbourhood: | Northfield |
Street Address: | 1,2,3 - 2535 McCullough Road |
Type of Application: | Leasehold Improvements |
File Number: | BP122778 |
Date Application Submitted: | December 28, 2016 |
Application Description: |
Tenant Improvements (Westmark Construction) expanding office space into unit #3. Installing a toilet and lavatory, area to be accessible. Installation of 11 new sprinkler heads. No FS required between a D and F2 however a 45min FRR required between units, upgrade for seismic restraint as per report from structural engineer. Building Re Classification 2012 BCBC 3.2.2.77. Group F2 occupancy and 3.2.2.61 Group D occupancy up to 2 storeys, sprinklered with fire alarm system, combustible or non-combustible construction. REVISION: Jan 17/18 - Add Structural Engineer to scope of work. |
Application Status: | COMPLETED |
Permit Value: | $30,000.00 |
Builder: | WESTMARK CONSTRUCTION LTD |
Issued Date: | February 20, 2017 |
File Close Date: | April 12, 2018 |
Expiry Date: | February 20, 2019 |
Associated Properties
Address | Zone | More |
---|---|---|
1 2535 MCCULLOUGH ROAD | I3 | Property Report |
2 2535 MCCULLOUGH ROAD | I3 | Property Report |
3 2535 MCCULLOUGH ROAD | I3 | Property Report |
2535 MCCULLOUGH ROAD | I3 | Property Report |
Process Steps
Task | Status |
---|---|
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visible for inspection. |
PASSED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
CANCELLED |
FRAMING
Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
FINAL-OLD
Final Approval as per requirements on plans. |
PASSED
2018-04-12 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.