BP122670 - 1930 Boxwood Road (BLDG 1)

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP122670 - 1930 Boxwood Road (BLDG 1)
Neighbourhood: Northfield    
Street Address: 1930 Boxwood Road (BLDG 1)
Type of Application: Commercial / Multi / Industrial
File Number: BP122670
Date Application Submitted: November 09, 2016
Application Description: Construction of an Industrial warehouse and shell office space, part 9 building, floors require a 45min FRR (although 1hr provided) and a 1hr FRR between the F2 and D occupancies. Service room has a 45min FRR wall. Sprinklered by By-Law, fire alarm system not required. Total building area is 377.8m2 with the first floor warehouse at 253.3m2 and the second storey office at 125.5m2. South wall setback 0.3m from property line and front yard setback of 4.5m. South wall constructed as a 2hr FRR concrete wall assembly.

REVISION: Sept 24/20 -revision to sprinklers as per Des Design as-built
REVISION: Oct 4/19- Construction of interior partition walls for reception area, offices, washrooms, staff areas, etc. Relocation & Addition of Emergency lighting, Exit signage, Fire Alarm pull stations & bells. Relocation of Sprinkler Heads. Addition of 5 handwash sinks, 2 pc washrooms with shower.
REVISION: June 12, 2020 - Revise back to shell building with 2 R/I washrooms and second floor.
Application Status: COMPLETED
Permit Value: $560,000.00
Builder: DOGWOOD MOUNTAIN HOMES LTD
Issued Date: January 12, 2017
File Close Date: October 20, 2020
Expiry Date: November 09, 2020

Process Steps

Task Status
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PARTIAL
FOOTING/FORMS

Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite.

PASSED
PERIMETER DRAIN

For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering.

PASSED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

CANCELLED
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PARTIAL
UNDERSLAB PLUMBING

complete underslab plumbing must be visible.

PASSED
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PARTIAL
UNDERSLAB INSULATION

Inspection required prior to placing slab concrete.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

CANCELLED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PARTIAL
PAPER/FLASHING/WATERPROOFING

When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PARTIAL
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visable for inspection.

PASSED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

FAILED
FRAMING

Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
APPROVAL-FIRE-OLD

Approval required prior to Occupancy

COMPLETED
FINAL-OLD

Final approval as per requirements on plans.

PASSED

2020-10-20

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy