BP122431 - 1959 Cinnabar Drive
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP122431 - 1959 Cinnabar Drive | |
---|---|
Neighbourhood: | Chase River |
Street Address: | 1959 Cinnabar Drive |
Type of Application: | Locate Permit |
File Number: | BP122431 |
Date Application Submitted: | September 15, 2016 |
Application Description: |
Relocate SFD REVISION:-Feb.1,2017-Add structural for crawlspace post and beam. |
Application Status: | COMPLETED |
Permit Value: | $39,900.00 |
Building Area: |
82.50 M2 888.02 ft2 |
Issued Date: | October 25, 2016 |
File Close Date: | March 02, 2017 |
Expiry Date: | October 25, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
1959 CINNABAR DRIVE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
FAILED |
FOOTING/FORMS
Inspection of Forms prior to any cement being poured. For Footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
CANCELLED |
PERIMETER DRAIN
For Perimeter Drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
STORM CONNECTION
Pipe connection must be visible for inspection. |
PARTIAL |
STORM CONNECTION
Pipe connection must be visible for inspection. |
CANCELLED |
STORM CONNECTION
Pipe connection must be visible for inspection. |
CANCELLED |
STORM CONNECTION
Pipe connection must be visible for inspection. |
PASSED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
SANITARY CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
CANCELLED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
FAILED |
WATER CONNECTION
Pipe Connection must be visible for inspection. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
FRAMING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
FAILED |
PAPER/FLASHING/WATERPROOFING
To take place after installation of framing, sheathing, building paper, flashing, and/or weatherproofing of openings and after window installation, but before installation of any siding product or stucco wire. |
PARTIAL |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.