BP122363 - 83 - 3200 Island Highway
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP122363 - 83 - 3200 Island Highway | |
---|---|
Neighbourhood: | Rutherford |
Street Address: | 83 - 3200 Island Highway |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP122363 |
Date Application Submitted: | August 25, 2016 |
Application Description: |
(Nordia Inc.) Call center - Installing new windows in east exterior wall. RMH Telecommunications CRU(B) unit 83 will be downsized to 2470 m2, Group D, Sprinklered with fire alarm. Occupant load = 266 persons, Exiting provided at rear into public corridor and at front into the public corridor; Existing washrooms, no plumbing changes. Sprinkler modifications. Installing 1 hr demising wall between suites adding fire and smoke stop system for penetrations. (Mall Classification)2012 Building Classification 3.2.2.62, Group E, non-combustible construction, sprinklered, fire alarm. |
Application Status: | COMPLETED |
Permit Value: | $30,000.00 |
Builder: | MCCARTAN CONTRACTING |
Issued Date: | September 01, 2016 |
File Close Date: | June 06, 2017 |
Expiry Date: | September 01, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
3200 ISLAND HIGHWAY N | CC3 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
CANCELLED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2017-06-06 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.