BP122349 - 1234 Kiwanis Crescent
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP122349 - 1234 Kiwanis Crescent | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 1234 Kiwanis Crescent |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP122349 |
Date Application Submitted: | August 22, 2016 |
Application Description: |
136.67m2, Second floor addition (lunch room) - Seniors housing complex. Work to include plumbing, new accessible washroom and laundry areas, and removal of two windows on third floor. Walls and floor of addition to have a 45min FRR. Kiwanis Soroptomists Building - 1094.5m2 three storey, 45 Unit, Group C Residential Building. Basement 223m2, 1st floor 1094.5m2, 2nd floor 992.7m2, 3rd floor 992.7m2. Building Classification: 2012 BCBC 3.2.2.53, Group C occupancy, sprinklered with fire alarm system, combustible construction ok, max. 3 storey, floor & mezz. & supports 45 minute FRR. |
Application Status: | COMPLETED |
Permit Value: | $250,000.00 |
Building Area: |
136.67 M2 1,471.10 ft2 |
Issued Date: | December 09, 2016 |
File Close Date: | May 23, 2019 |
Expiry Date: | December 09, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
1234 KIWANIS CRESCENT | CS1 | Property Report |
Process Steps
Task | Status |
---|---|
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
MONITORING FIELD REVIEW
A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2019-05-23 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.