BP122339 - 5220 Hammond Bay Road (Bldg D) - 3396/3398 Pinestone Way
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP122339 - 5220 Hammond Bay Road (Bldg D) - 3396/3398 Pinestone Way | |
---|---|
Neighbourhood: | North Slope |
Street Address: | 5220 Hammond Bay Road (Bldg D) - 3396/3398 Pinestone Way |
Type of Application: | Commercial / Multi / Industrial |
File Number: | BP122339 |
Date Application Submitted: | August 18, 2016 |
Application Description: |
BLDG D inspections only REVISION Dec 19 - Units B, C, D delete dining room door, replace master bedroom window to patio door, relocate stairs and patio to master bedroom, centre dining room window. New drawings received. REVISION MAY 18, 2017 Addition of deck to master bedrooms on units B & D. REVISION Apr 6, 17 - Changed location of toilet and lavatory in main floor and second floor bathrooms. |
Application Status: | COMPLETED |
Builder: | WESTMARK CONSTRUCTION LTD |
Issued Date: | October 06, 2016 |
File Close Date: | August 17, 2017 |
Expiry Date: | October 06, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
3396 PINESTONE WAY | R6 | Property Report |
3398 PINESTONE WAY | R6 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
SCHEDULED |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
PASSED |
UNDERSLAB INSULATION
Inspection required prior to placing slab concrete. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
SCHEDULED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PARTIAL |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
OCCUPANCY-OLD | CANCELLED |
OCCUPANCY-OLD | FAILED |
OCCUPANCY-OLD |
PASSED
2017-08-17 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.