BP122058 - 101 - 10 Chapel Street

Interested in this application? Login to manage subscriptions to subscribe to updates!

Search Again
BP122058 - 101 - 10 Chapel Street
Neighbourhood: Downtown/Old City    
Street Address: 101 - 10 Chapel Street
Type of Application: Leasehold Improvements
File Number: BP122058
Date Application Submitted: June 01, 2016
Application Description: (Remedy Coffee Bar) Tenant improvement to create a small cafe serving prepared food items, no food preparation on-site. To be located in a current vacant space on the main floor of a 5 Storey building. One universal washroom.

New multi-family building, 24 dwellings and 1 CRU, 6 Storey designed to 3.2.2.50 mid-rise wood frame building. 5 storeys wood frame on non-combustible first storey parking garage and one CRU.

REVISION: Oct 30, 2018 - Delete washroom, Relocate door to H/C washroom, relocate sink. New occupant load at 10 persons including staff to be posted.
Application Status: COMPLETED
Permit Value: $8,500.00
Builder: REMEDY COFFEE BAR
Issued Date: June 20, 2016
File Close Date: June 27, 2019
Expiry Date: June 20, 2020

Associated Properties

Address Zone More
101   10 CHAPEL STREET DT5 Property Report
10 CHAPEL STREET DT5 Property Report

Process Steps

Task Status
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

FAILED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PARTIAL
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN PLUMBING

Rough in plumbing must be complete including potable water piping.

PASSED
ROUGH IN SPRINKLER

Rough in sprinkler must be complete and visible for inspection.

PASSED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

FAILED
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PARTIAL
FRAMING

Rough in plumbing and electrical must be complete. Survey Certificate and Truss Layouts required for approval.

PASSED
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PARTIAL
INSULATION

Insulation and vapour barrier to be complete prior to inspection.

PASSED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PASSED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

FAILED
MONITORING FIELD REVIEW

A building official may attend the site from time to time during the course of construction to ascertain that the field reviews are taking place and to monitor the field reviews undertaken by the registered professional.

PARTIAL
PLUMBING FINAL-OLD

All fixtures must be in place.

PASSED
SPRINKLER FINAL-OLD

Sprinkler system must be complete and operating as intended.

PASSED
FINAL-OLD

Final Approval as per requirements on plans.

FAILED
FINAL-OLD

Final Approval as per requirements on plans.

PASSED

2019-06-27

Map
View in Google Earth (KML)


Disclaimer:

The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo. Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation. The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.

The Information Provided within this website is for Informational Purposes Only. It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.

Help us improve our website

Don't include private or financial information in this form.

Collection and use of your personal information
Information collected on this form is done so under the general authority of the Community Charter and Freedom of Information and Protection of Privacy Act (FOIPPA), and is protected in accordance with FOIPPA.  Personal information will only be used by authorized staff to fulfill the purpose for which it was originally collected, or for a use consistent with that purpose. Questions about the collection of your personal information may be referred to the Legislative Services Department at (250) 755-4405, or via email at foi@nanaimo.ca.
Privacy Policy