BP121965 - 560 Pythian Lane (main house)
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121965 - 560 Pythian Lane (main house) | |
---|---|
Neighbourhood: | Townsite |
Street Address: | 560 Pythian Lane (main house) |
Type of Application: | Single / Two Family Alteration |
File Number: | BP121965 |
Date Application Submitted: | May 06, 2016 |
Application Description: | Remove unauthorized suite, remove bedroom addition, remove all interior walls, plumbing and finishes from the crawlspace, remove exterior stairs, door, roof to the second floor and reinstall exterior window at door location, remove non comforming roof over crawlspace access and expose rough in plumbing for bathroom constructed without permit on main floor. |
Application Status: | COMPLETED |
Permit Value: | $15,000.00 |
Builder: | BOEHM CONSTRUCTION LTD |
Issued Date: | June 15, 2016 |
File Close Date: | August 05, 2016 |
Expiry Date: | June 15, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
560 PYTHIAN LANE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
Complete underslab plumbing must be visible |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
FAILED |
ROUGH IN PLUMBING
Rough In plumbing must be complete including water piping. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
SCHEDULED |
FRAMING
Rough in plumbing & electrical must be complete. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-07-08 |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-08-05 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.