BP121961 - 5105 Dunn Place - Unit B
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search Again| BP121961 - 5105 Dunn Place - Unit B | |
|---|---|
| Neighbourhood: | North Slope | 
| Street Address: | 5105 Dunn Place - Unit B | 
| Type of Application: | Single / Two Family Dwelling | 
| File Number: | BP121961 | 
| Date Application Submitted: | May 06, 2016 | 
| Application Description: | For the construction of a 2 1/2 storey single family dwelling on crawlspace with attached single car garage. | 
| Application Status: | COMPLETED | 
| Permit Value: | $233,673.98 | 
| Building Area: | 
                        160.72 M2 1,729.97 ft2  | 
                
| Builder: | WINDLEY CONTRACTING LTD | 
| Issued Date: | May 25, 2016 | 
| File Close Date: | October 13, 2016 | 
| Expiry Date: | May 25, 2018 | 
Associated Properties
| Address | Zone | More | 
|---|---|---|
| 5107 DUNN PLACE | R10 | Property Report | 
| 5105 DUNN PLACE | R10 | Property Report | 
Process Steps
| Task | Status | 
|---|---|
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PARTIAL | 
| 
                                FOOTING / FORMS
                                     Inspection of forms prior to any concrete being poured  | 
                            PASSED | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            PARTIAL | 
| 
                                PERIMETER DRAIN
                                     For perimeter drain , foundation walls should be damp proofed and drain tile in place with drain rock covering  | 
                            PASSED | 
| 
                                UNDERSLAB INSULATION
                                     Inspection required prior to placing slab concrete  | 
                            PASSED | 
| 
                                STORM CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PARTIAL | 
| 
                                SANITARY CONNECTION
                                     Pipe and Connection must be visible for inspection  | 
                            PASSED | 
| 
                                WATER CONNECTION
                                     Pipe and Connection must be visable for inspection  | 
                            PASSED | 
| 
                                ROUGH IN PLUMBING
                                     Rough in plumbing must be complete including potable water piping  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PARTIAL | 
| 
                                PAPER/FLASHING/WATERPROOFING
                                     When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco.  | 
                            PASSED | 
| 
                                FRAMING
                                     Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval  | 
                            PARTIAL | 
| 
                                FRAMING
                                     Rough in plumbing and electrical must be complete. Survey Certificate & Truss Layouts required for approval  | 
                            PASSED | 
| 
                                INSULATION
                                     Insulation and vapour barrier to be complete prior to inspection  | 
                            PASSED | 
| 
                                OCCUPANCY-OLD
                                     Exterior of house must be complete including stairs, decks, handrails, porches and exterior finish  | 
                            
                                PASSED
                                     2016-10-13  | 
                        
| Map | 
|---|
                          View in Google Earth (KML)
                     | 
                
            
            Disclaimer:
            
            The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
            Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
            The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
            