BP121956 - 5371 Bergen-op-zoom
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121956 - 5371 Bergen-op-zoom | |
---|---|
Neighbourhood: | Pleasant Valley |
Street Address: | 5371 Bergen-op-zoom |
Type of Application: | Garage / Carport Permit |
File Number: | BP121956 |
Date Application Submitted: | May 05, 2016 |
Application Description: |
For the construction of a detached two car garage/shop. REVISION: August 10/2016 - Delete window from rear of garage. LB |
Application Status: | COMPLETED |
Permit Value: | $37,361.50 |
Building Area: |
80.30 M2 864.34 ft2 |
Issued Date: | May 31, 2016 |
File Close Date: | September 09, 2016 |
Expiry Date: | May 31, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
5371 BERGEN-OP-ZOOM DRIVE | R1 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PARTIAL |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
CANCELLED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2016-09-09 |
Map |
---|
|
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.