BP121897 - 130 Yon Place
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121897 - 130 Yon Place | |
---|---|
Neighbourhood: | Diver Lake |
Street Address: | 130 Yon Place |
Type of Application: | Single / Two Family Alteration |
File Number: | BP121897 |
Date Application Submitted: | April 20, 2016 |
Application Description: |
12' 6"x11' 6" uninsulated/unheated sunroom addition on slab on grade to rear of existing residence. Revision: June 15, 2016 Reduce window size and add a window in the door on the left elevation. AB |
Application Status: | COMPLETED |
Permit Value: | $7,500.00 |
Building Area: |
13.30 M2 143.16 ft2 |
Issued Date: | May 27, 2016 |
File Close Date: | August 18, 2016 |
Expiry Date: | May 27, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
130 YON PLACE | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any concrete being poured. For footing inspection, forms must be complete and approved plans (complete with City stamp) must be onsite. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PARTIAL |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
FAILED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-08-18 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.