BP121640 - 555 Sarum Rise
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121640 - 555 Sarum Rise | |
---|---|
Neighbourhood: | University District |
Street Address: | 555 Sarum Rise |
Type of Application: | Garage / Carport Permit |
File Number: | BP121640 |
Date Application Submitted: | February 03, 2016 |
Application Description: |
Construction of a detached 16'x20' garage at rear of lot. REVISION April 20: Relocated Man Door, Revised Gabled end roof to Hip. Required Truss Drawings. |
Application Status: | COMPLETED |
Permit Value: | $18,163.71 |
Building Area: |
29.72 M2 319.90 ft2 |
Issued Date: | February 24, 2016 |
File Close Date: | July 07, 2016 |
Expiry Date: | February 23, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
555 SARUM RISE WAY | R5 | Property Report |
Process Steps
Task | Status |
---|---|
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PARTIAL |
FOOTING/FORMS
Inspection of forms prior to any cement being poured . For footing inspection, forms must be complete and approved plans (complete with City Stamp) must be onsite. |
PASSED |
PERIMETER DRAIN
For perimeter drain, foundation walls should be damp proofed and drain tile in place with drain rock covering. |
PASSED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
FAILED |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PARTIAL |
PAPER/FLASHING/WATERPROOFING
When framing, sheathing, building paper, flashing, weatherproofing of openings and window installation is complete, but before installation of any siding, wire mesh or stucco. |
PASSED |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough-in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
INSULATION
Insulation and vapour barrier to be complete prior to inspection. |
PASSED |
FINAL-OLD
Final Approval as per requested on plans. |
PASSED
2016-07-07 |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.