BP121607 - 120 - 2000 Island Highway North - Drawings Scanned
Interested in this application? Login to manage subscriptions to subscribe to updates!
Search AgainBP121607 - 120 - 2000 Island Highway North - Drawings Scanned | |
---|---|
Neighbourhood: | Departure Bay |
Street Address: | 120 - 2000 Island Highway North - Drawings Scanned |
Type of Application: | Commercial / Multi-Res Alteration |
File Number: | BP121607 |
Date Application Submitted: | January 22, 2016 |
Application Description: |
Group E, 441.75m2, interior tenant improvement for a new liquor store including the addition of new plumbing fixtures, new sprinkler heads and a seminar/tasting room. Brooks Landing building description - 12,981 m2 sprinklered building (fire alarm) with non-combustible and combustible construction divided by firewalls under Equivalency. Fast response sprinklers required per equivalency report. April 27, 2016 - Revised drawings received showing alterations to cooler, office dimensions taking into account fire protection engineers evaluation dated April 15, 2016. Also changes to entrance/exit layout, minor lighting & electrical, addition of stereo cabinet and minor cosmetic changes. |
Application Status: | COMPLETED |
Permit Value: | $100,000.00 |
Building Area: |
441.75 M2 4,754.95 ft2 |
Issued Date: | April 22, 2016 |
File Close Date: | July 11, 2016 |
Expiry Date: | April 22, 2018 |
Associated Properties
Address | Zone | More |
---|---|---|
2000 ISLAND HIGHWAY N | CD8 | Property Report |
Process Steps
Task | Status |
---|---|
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PARTIAL |
UNDERSLAB PLUMBING
complete underslab plumbing must be visible. |
PASSED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
CANCELLED |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PARTIAL |
ROUGH IN PLUMBING
Rough in plumbing must be complete including potable water piping. |
PASSED |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PARTIAL |
ROUGH IN SPRINKLER
Rough in sprinkler must be complete and visable for inspection. |
PASSED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PARTIAL |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
FAILED |
FRAMING
Rough in plumbing & electrical must be complete. Survey Certificate & Truss layouts required for approval. |
PASSED |
SPRINKLER FINAL-OLD
Sprinkler system must be complete and operating as intended. |
PASSED |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PARTIAL |
PLUMBING FINAL-OLD
All fixtures must be in place. |
PASSED |
FINAL-OLD
Final approval as per requirements on plans. |
CANCELLED |
FINAL-OLD
Final approval as per requirements on plans. |
FAILED |
FINAL-OLD
Final approval as per requirements on plans. |
PASSED
2016-07-11 |
FINAL-OLD
Final approval as per requirements on plans. |
SCHEDULED |
Map |
---|
![]() |
Disclaimer:
The City of Nanaimo does not endorse any information contained herein by parties not affiliated with the City of Nanaimo.
Furthermore, the City of Nanaimo is providing the information contained within this website without warranty, guarantee, or further obligation.
The City is not liable for any consequences or damages any individual may incur as a result of misrepresented, misquoted, or mistaken information.
The Information Provided within this website is for Informational Purposes Only.
It is not meant to be an authoritative guide, and will not in any circumstances override any decisions or standards made or set by any representative or agent of the City of Nanaimo.